Preface
The Server Deployment Package (SDP) is the implementation of Perforce’s recommendations for operating and managing a production Perforce Helix Core Version Control System. It is intended to provide the Helix Core administration team with tools to help:
-
High Availability (HA)
-
Disaster Recovery (DR)
This guide is intended to provide instructions for failover in an SDP environment using built in Helix Core features.
Please Give Us Feedback
Perforce welcomes feedback from our users. Please send any suggestions for improving this document or the SDP to consulting@perforce.com.
1. Overview
Relevant Docs:
We need to consider planned vs unplanned failover. Planned may be due to upgrading the core Operating System or some other dependency in your infrastructure, or a similar activity.
Unplanned covers risks you are seeking to mitigate with failover:
-
loss of a machine, or some machine related hardware failure
-
loss of a VM cluster
-
failure of storage
-
loss of a data center or machine room
-
etc…
1.1. Planning
HA failover should not require a P4PORT change for end users. Depending on your topology, you can avoid changing P4PORT by having users set their P4PORT to a DNS name that is centrally managed.
For example:
-
bos-helix-01
, a master/commit-server in Boston, pointed to by a DNS name likeperforce
orperforce.p4demo.com
. -
bos-helix-02
, a standby replica in Boston, not pointed to by a DNS until failover. In event of failover, it gets pointed to byperforce
/perforce.p4demo.com
via a DNS change.
Other advanced networking options might be possible if you talk to your local networking gurus (virtual IPs etc).
2. Planned Failover
In this instance you can run p4 failover
with the active participation of its upstream server.
We are going to provide examples with the following assumptions:
-
ServerID
master_1
is current commit, running on machinep4d-bos-01
-
ServerID
p4d_ha_bos
is HA server -
DNS alias
perforce
is set top4d-bos-01
2.1. Prerequisites
You need to ensure:
-
you are running p4d 2018.2 or later for your commit and all replica instances, preferably 2020.1+
source /p4/common/bin/p4_vars 1 p4 info | grep version
-
your failover target server instance is of type
standby
orforwarding-standby
On HA machine:
p4 info : ServerID: p4d_ha_bos Server services: standby Replica of: perforce:1999 :
-
it has Options mandatory set in its server spec
p4 server -o p4d_ha_bos | grep Options Options: mandatory
-
you have a valid
license
installed in/p4/1/root
(<instance> root)On HA machine:
cat /p4/1/root/license
-
Monitoring is enabled - so the following works:
p4 monitor show -al
-
DNS changes are possible so that downstream replicas can seamlessly connect to HA server
-
Current
pull
status is validp4 pull -lj
-
You have a valid
offline_db
for the HA instanceCheck that the sizes of the
db.*
are similar - compare output:ls -lhSr /p4/1/offline_db/db.* | tail ls -lhSr /p4/1/root/db.* | tail
Check the current journal counter and compare against live journal counter:
/p4/1/bin/p4d_1 -r /p4/1/offline_db -jd - db.counters | grep journal p4 counters | grep journal
-
Check all defined triggers will work (see next section) - including Swarm triggers
-
Check authentication will work (e.g. LDAP configuration)
-
Check firewall for HA host - ensure that other replicas will be able to connect on the appropriate port to the instance (using the DNS alias)
2.1.1. Pre Failover Checklist
It is important to perform these checks before any planned failover, and also to make sure they are considered prior any unplanned failover.
2.1.1.1. Confirm Trust Established with Replicas
If using ssl
on the commit server, then downstream replicas with have already set up P4TRUST
entries with that server and its fingerprint.
After failover, you need to check that all replicas have appropriate p4 trust
setup with the HA server (which is now the commit server).
If you are using background submit between edge and commit servers, then you need to confirm the following:
-
p4 trust
is setup on the HA (new commit) with all edge servers -
the commit service user is correctly logged on to all edge servers (make sure the configurable
auth.id
is appropriately set to avoid IP-only tickets) on the HA server before failover
To check on background submit configuration:
p4 configure show allservers | grep bg
2.1.1.2. Checks for edge server failover to its HA
Similar to the above, if background submit is turned on then you need to confirm the following:
-
p4 trust
is setup on the commit with the new edge servers (which was edge HA) -
the commit service user is correctly logged on to the new edge server
2.1.1.3. Swarm Triggers
If Swarm is installed, ensure:
-
Swarm trigger is installed on HA machine (could be executed from a checked in depot file)
Typically installed (via package) to
/opt/perforce/swarm-triggers/bin/swarm-trigger.pl
But can be installed anywhere on the filesystem
Execute the trigger to ensure that any required Perl modules are installed:
perl swarm-trigger.pl
Note that things like
JSON.pm
can often be installed with:sudo apt-get install libjson-perl
or
sudo yum install perl-JSON
-
Swarm trigger configuration file has been copied over from commit server to appropriate place.
This defaults to one of:
/etc/perforce/swarm-trigger.conf /opt/perforce/etc/swarm-trigger.conf swarm-trigger.conf (in the same directory as trigger script)
2.1.1.4. Other Triggers
Checklist:
-
Make sure the actual referenced script has been copied to the HA server prior to failover!
-
Note that executing triggers from the depot can make this easier - but following issue still applies
-
-
Make sure that the appropriate version of
perl
,python
,ruby
etc are installed in locations as referenced byp4 triggers
entries. -
Make sure that any relevant modules and dependencies have also been installed (e.g.
P4Python
orP4Perl
)
2.1.1.5. Other Replica’s P4TARGET
Review the settings for other replicas and also to check live replicas on the source server of the failover (p4 servers -J
)
p4 configure show allservers | grep P4TARGET
Make sure the above settings are using correct DNS alias (which will be redirected).
2.1.1.6. Proxies
These are typically configured via /p4/common/bin/p4_1.vars
settings:
export PROXY_TARGET=
Ensure the target is the correct DNS alias (which will be redirected).
2.1.1.7. HA Server OS Configuration
Check to make sure any performance configuration such as turning off THP (transparent huge pages), and putting serverlocks.dir into a RAM filesystem have also been made to your HA Failover system. See SDP Guide: Maximizing Server Performance
2.2. Failing over
The basic actions are the same for Unix and Windows, but there are extra steps required as noted in Section 2.4, “Failing over on Windows”
-
Rotate the active journal on the master:
p4 admin journal p4 servers -J # Check all is up-to-date
-
Run
p4 failover
in reporting mode on HA machine:p4 failover
Successful output looks like:
Checking if failover might be possible ... Checking for archive file content not transferred ... Verifying content of recently update archive files ... After addressing any reported issues that might prevent failover, use --yes or -y to execute the failover.
-
Perform failover:
p4 failover --yes
Output should be something like:
Starting failover process ... Refusing new commands on server from which failover is occurring ... Giving commands already running time to complete ... Stalling commands on server from which failover is occurring ... Waiting for 'journalcopy' to complete its work ... Waiting for 'pull -L' to complete its work ... Waiting for 'pull -u' to complete its work ... Checking for archive file content not transferred ... Verifying content of recently updated archive files ... Stopping server from which failover is occurring ... Moving latest journalcopy'd journal into place as the active journal ... Updating configuration of the failed-over server ... Restarting this server ...
During this time, if you run commands against the master, you may see:
Server currently in failover mode, try again after failover has completed
-
Change the DNS entries so downstream replicas (and users) will connect to the new master (that was previously HA)
-
Validate that your downstream replicas are communicating with your new master
On each replica machine:
p4 pull -lj
Or against the new master:
p4 servers -J
Check output of
p4 info
:: Server address: p4d-bos-02 : ServerID: master_1 Server services: commit-server :
-
Make sure the old server spec (
p4d_ha_bos
) has correctly had itsOptions:
field set tonomandatory
(otherwise all replication would stop!)
2.3. Post Failover
2.3.1. Validation of SDP Config
-
Run the script:
/p4/common/bin/verify_sdp.sh 1
(or specify other instance ID).
Ensure that all output is valid and that there are no errors.
Ensure that the following returns 'yes':
/p4/common/bin/run_if_master.sh 1 echo yes
If it does not, then run: bash -xv /p4/common/bin/run_if_master.sh 1 echo yes
and check the output. The
most likely problems are things like the settings of the following variables in /p4/common/config/p4_1.vars
:
P4MASTERHOST <== Set to DNS name of new master host P4MASTER_ID <== Make sure this is same as value in /p4/1/root/server.id on the master server machine.
2.3.2. Moving of Checkpoints
After failing over, on Unix there will be journals which may need to be copied/moved and renamed due to the SDP structure.
For example, an HA server might have stored its journals in /p4/1/checkpoints.ha_bos
(assuming it was create by mkrep.sh
with serverid p4d_ha_bos
):
/p4/1/checkpoints.ha_bos/p4_1.ha_bos.jnl.123 /p4/1/checkpoints.ha_bos/p4_1.ha_bos.jnl.124
As a result of failover, these files need to be copied/moved to:
/p4/1/checkpoints/p4_1.jnl.123 /p4/1/checkpoints/p4_1.jnl.124
Easiest way is to install prename on your Linux. Then p4rename -n 's/.ha_bos//' p4_1.* - and
re-run without the -n if it looks good.
|
The reason different directories are sometimes used is because in some installations the /hxdepots
filesystem is shared on NFS between commit server and HA server. When /hxdepots
is shared, the journalPrefix
must be set differently to avoid path conflicts on the shared storage.
If these files are not present, then normal SDP crontab tasks such as daily_checkpoint.sh will fail as they won’t be able to find the required journals to be applied to the offline_db .
|
The following command will rotate journal and replay any missing ones to offline_db
(it is both fairly quick and safe to run without placing much load on the server host as it doesn’t do any checkpointing):
/p4/common/bin/rotate_journal.sh 1
If it fails, then check /p4/1/logs/checkpoint.log
for details - it may have an error such as:
Replay journal /p4/1/checkpoints/p4_1.jnl.123 to offline db.
Perforce server error: open for read: /p4/1/checkpoints/p4_1.jnl.123: No such file or directory
This indicates missing journals which will need to be moved/copied as above.
2.3.3. Check daily_checkpoint.sh runs successfully
This is an important script for a master server, and it is good to make sure ASAP after failover that it works as expected.
nohup /p4/common/bin/daily_checkpoint.sh 1 &
And check output in: /p4/1/logs/checkpoint.log
This script can take a while on big repositories. It is OK to have it run in the crontab over night. |
2.3.4. Check on Replication
We recommend that you connect to all your replicas/proxies/brokers and make sure that they are successfully working after failover.
It is surprisingly common to find forgotten configuration details meaning that they are attempting to connect to old server for example!
For proxies and brokers - you probably just need to run:
p4 info
For downstream replicas of any type, we recommend logging on to the host and running:
p4 pull -lj
and checking for any errors.
We also recommend the following is executed on both HA server and all replicas and the output examined for any unexpected errors:
grep -A4 'Perforce server error:' /p4/1/logs/log
Or you can review the contents of /p4/1/logs/errors.csv
if you have enabled structured logging.
2.4. Failing over on Windows
The basic steps are the same as for on Unix, but with some extra steps at the end.
After the p4 failover --yes
command has completed its work (on the HA server machine):
-
Review the settings for the Windows service (examples are for instance
1
) - note below -S is uppercase:p4 set -S p4_1
Example results:
C:\p4\1>p4 set -S p4_1 : P4JOURNAL=c:\p4\1\logs\journal (set -S) P4LOG=c:\p4\1\logs\p4d_ha_aws.log (set -S) P4NAME=p4d_ha_aws (set -S) P4PORT=1666 (set -S) P4ROOT=c:\p4\1\root (set -S) :
-
Change the value of
P4NAME
andP4LOG
to correct value formaster
:p4 set -S p4_1 P4NAME=master p4 set -S p4_1 P4LOG=c:\p4\1\logs\master.log
And re-check the output of
p4 set -S p4_1
-
Restart the service:
c:\p4\common\bin\svcinst stop -n p4_1 c:\p4\common\bin\svcinst start -n p4_1
-
Run
p4 configure show
to check that the output is as expected for the above values.
2.4.1. Post Failover on Windows
This is slightly different for the Windows and Linux SDP, since there is currently no equivalent of mkrep.sh
for Windows, and replication topologies on Windows are typically smaller and simpler.
Thus it is Windows HA instances are likely to have journals rotated into c:\p4\1\checkpoints
instead of something like c:\p4\1\checkpoints.ha_bos
.
However, it is still worth ensuring things like:
-
offline_db
on HA is up-to-date -
all triggers (including any Swarm triggers) are appropriately configured
-
daily_backup.bat
will work appropriate after failover
2.5. Preparation for Failing Back - Setup original commit server as new Failover replica
After failover it is quite common to want to to "failback" to the original machine. This is fairly straight forwards if you are going to use the same server ids (master and failover replica).
The steps are:
-
Reset the original master to be the failover replica
-
Once it is up and running as a replica, then you can just use
p4 failover
on it, and then use these same instructions to reset the original HA replica to be running as a failover target.
The original master p4d service will have been stopped as part of failover, and will not be able to restart without some configuration changes.
Note that for convenience below, we assume SDP instance 1
and failover serverid p4d_ha_bos
.
The commands below are run on the on original master server which will now become the HA failover replica. |
-
Change the serverid to replica serverid:
cd /p4/1/root mv server.id save/ mv state* save/ echo p4d_ha_bos> server.id
-
Reset the journal and logs:
cd /p4/1/logs mkdir -p save mv journal* save/ mv log log.old
-
Restart the service and ensure the
serviceUser
is logged in:sudo systemctl restart p4d_1 /p4/common/bin/p4login -v -service 1 p4 pull -lj
-
You may wish to ensure that verification of recent archive/depot files has been done, especially if the service was stopped for hours or days since the original failover.
nohup /p4/common/bin/p4verify.sh -o MISSING -recent &
Please note details for definition of "recent" and how to extend that: p4verify.sh
At this stage, the replica should be replicating as normal. If it is not, then please follow standard replication trouble shooting procedures.
The Server spec will have had its Options: set to nomandatory - and this should be set back to mandatory when the replica is working correctly.
|
3. Unplanned Failover
In this case there is no active participation of upstream server, so there is an increased risk of lost data.
We assume we are still failing over to the HA machine, so:
-
Failover target is
standby
orforwarding-standby
-
Server spec still has
Options:
set tomandatory
-
Original master is not running
The output of p4 failover
on the DR machine might be:
Checking if failover might be possible ... Server ID must be specified in the '-s' or --serverid' argument for a failover without the participation of the server from which failover is occurring. Checking for archive file content not transferred ... Verifying content of recently update archive files ... After addressing any reported issues that might prevent failover, use --yes or -y to execute the failover.
-
Execute
p4 failover
with the extra parameter to specify server we are failing over from:p4 failover --serverid master_1 --yes
Expected output is somewhat shorter than for planned failover:
Starting failover process ... Waiting for 'pull -L' to complete its work ... Checking for archive file content not transferred ... Verifying content of recently updated archive files ... Moving latest journalcopy'd journal into place as the active journal ... Updating configuration of the failed-over server ... Restarting this server ...
3.1. Post Unplanned Failover
This is similar to Section 2.3, “Post Failover” with the exception of the next section below.
3.1.1. Resetting Downstream Replicas
In an unplanned failover scenario, if the standby server is not a 'mandatory' standby, it is possible that there is a journal synchronization problem with downstream replicas.
The output of p4 pull -lj
may indicate an error, and/or there may be errors in the log:
grep -A4 error: /p4/1/logs/log | less
If you need to reset the replica to restart from the beginning of the current journal it is attempting to pull, then the process is:
-
Stop the replica:
sudo systemctl stop p4d_1
-
Remove the
state
file:cd /p4/1/root mv state save/
-
Restart the replica
sudo systemctl start p4d_1
-
Recheck the log for errors as above.
3.2. Unplanned Failover on Windows
The extra steps required are basically the same as in Section 2.4, “Failing over on Windows” as well as the steps in Section 3.1, “Post Unplanned Failover”